125 kW and 257 kWh. An option for a defined printing-load group where operating duty fits the system. Review drying, auxiliaries and starting conditions.
For print shops and printed-packaging manufacturers
A print run depends on the whole production chain. We design backup power for printing plants with Sungrow equipment for agreed printing and finishing processes, ventilation and controls, from site assessment to operating tests.
A stopped press, dryer or finishing line has different consequences. Work with the process team to define dependencies, interruption limits and the response for each line.
The objective may be to finish an agreed operation, retain supporting functions or supply a selected line. Establish that objective before choosing battery capacity.
From the distribution board to the operating brief
Press power alone does not describe the complete line. The design includes dependent units, sensitive controls, source transfer and recovery after an interruption.
Map presses, dryers and supporting systems on the electrical diagram. Identify the functions required for each operating scenario.
Measure printing, makeready, starts and drying demand. Review controller interruption limits and any dedicated UPS requirement.
Review storage, the existing generator, controls and the grid. The selected electrical arrangement must support the intended island mode.
Check the auxiliary and machine restart sequence, control recovery and charging. Avoid an unplanned simultaneous restart.
Storage does not replace process interlocks or guarantee uninterrupted printing. Machine documentation and the print-plant team define interruption limits and shutdown procedures.
Sungrow matched to print-plant scale
Assess PowerStack for defined loads. Consider PowerTitan 2.0 for a large printing site with suitable aggregate demand, grid connection and installation space.
125 kW and 257 kWh. An option for a defined printing-load group where operating duty fits the system. Review drying, auxiliaries and starting conditions.
125 kW and 514 kWh. More nominal stored energy for the agreed load. Doubling capacity does not mean twice as many presses can operate simultaneously.
Configurations: 2,500 kW (2h) or 1,250 kW (4h). These labels describe equipment, not guaranteed running time for your print job.
A container system for a large printing or packaging complex. Connection, island operation and the utility site need separate engineering checks. This is not a default package for every print shop.
These are nominal equipment ratings. Suitability for your line, usable energy and backup duration require the actual project inputs.
Account for makeready, printing and standby separately. Heating, cooling and extraction belong in the agreed demand profile.
Compare concurrent presses, compressors and finishing lines. Check brief peaks separately from average consumption.
Plan siting around paper, inks, dust, cables and maintenance access. Verify the actual conditions at the site.
Financial assessment from print-plant evidence
Compare options using the same machine list and operating duty. Separate the costs of backup, self-generation and electrical-network modifications.
Job schedules, shifts, measured demand, interruption limits and budget. The business validates the effects of stoppages and repeat makeready.
Equipment, transfer, boards, cable routes, site preparation and commissioning. Identify service terms, VAT, currency and quotation validity separately.
Pricing and financial scenarios follow an enquiry and data collection. Include electricity-contract terms, losses and battery life. Lower peaks do not automatically mean a lower tariff.
Agree access, production interruptions and test criteria before installation. Include printing, electrical and site teams in the preparation.
Focused materials for your team
Send an enquiry and a short equipment overview. After clarifying the objective and available data, we prepare materials for production and finance discussions.
Presses, drying, postpress and dependent units. Distinguish continued operation, cycle completion and recovery.
Inputs, Sungrow options, engineering work and site questions. Identify assumptions and any further measurements required.
Questions from printing businesses
Line boundaries, drying, controls and generators. Use these answers to prepare a technical enquiry.
That boundary can be considered, but first check drying, cooling, feeding, compressed air and control dependencies. The dedicated circuit must include every function needed for the agreed operation. Diagrams and measurements determine the final scope.
No. It depends on the machine’s interruption limit, transfer design, load and usable energy. The objective may be completion of an individual operation or a controlled stop. Agree the conditions with the process team and test them at commissioning.
Use the actual technology and model. Electrical ratings, operating modes, cooling and ventilation are required. Where an external heat source is used, electrical backup does not replace it. Do not apply one dryer’s consumption to all technologies.
Include it when required by the agreed job route. Cutters, folders, die-cutters and other finishing machines have their own duty and drives. Check whether they operate alongside printing and which steps can be deferred.
Review controller and press-manufacturer requirements. If the permitted interruption is shorter than the selected transfer can provide, a separate continuous-supply solution is needed. Assess storage and UPS equipment for their different roles.
Establish the machine list, work schedule and usable energy first. Include charge state, losses, dryers and auxiliary equipment. The 2h or 4h equipment designation does not promise a printing duration for your line.
Assess its rating, condition, controls and existing wiring. The design defines transfer, load allocation and potential storage charging. Parallel or island operation must use a verified configuration.
Printing schedules, machine inventories, finishing-line power and the conditions for completing and restarting a cycle. Add supply diagrams, dryer and ventilation details, generator data and measured consumption. Identify future equipment demand separately as a forecast.
Review daytime demand, annual schedules, available space and connection conditions. Night operation affects the model but does not determine it alone. Standard grid-tied solar without a backup architecture cannot supply an outage.
Check the location against equipment documentation and site conditions. Consider paper, inks, dust, vehicle movement, engineering clearances and maintenance access. For leased premises, clarify usage rights and occupancy duration.
After an enquiry, an agreed operating brief and data collection. The financial model includes the complete works, operation, battery life and electricity-contract terms. The print shop validates downtime impacts; there is no universal payback period.
The proposal records equipment and installation warranties. Separately agree monitoring, planned inspections, contact procedures and response times. Handover includes documentation and operating-test results.
Planning a separate project for your home? ONG partner STEVARA can select Powerwall for household demand. Its team has completed Tesla training and certification.
Start with schedules and equipment
Which machines matter during an outage, and what should happen to the current job? We will clarify inputs and agree the next technical step.
Printing plant backup
Printing-sector enquiry. Identify the equipment and the required response to a power interruption.
Let's get acquainted and help you
Press Enter to continue
By clicking the button, you agree to privacy policy