Solar power with battery storage: self-consumption, surplus and sales
Markets and business models

Solar power with battery storage: self-consumption, surplus and sales

How to compare solar generation, load and storage and check compatibility, losses and available operating modes.

10 min estimated reading time

Read the articleBack to the guide
A building with rooftop solar panels, two graphite battery cabinets and a white control cabinet on a white background.

In this article

A solar power plant with battery storage can shift some solar energy to another time. The result depends on generation and consumption profiles, the connection layout, available power and usable capacity. A battery does not increase the solar resource and does not by itself guarantee backup power or profitable sales.

This article distinguishes direct consumption, charging, export and generation curtailment. It presents a hypothetical hourly balance and the information needed to choose a configuration. For an existing facility, check the capabilities of installed equipment; for a new project, agree these requirements before procurement.

Why start with an hourly profile

Equal monthly generation and consumption do not mean they occur at the same time. A business may use most electricity in the evening while its solar plant generates during the day. Compare time series, not just billing totals.

For each interval, identify generation, simultaneous load and the direction of flow at the grid boundary. After direct use of solar electricity, a surplus may remain. Charging is limited by available power, free capacity, operating conditions and set priorities.

Distinguish ESS power and usable capacity. The first determines the permitted rate of energy exchange; the second is the available energy reserve. A large battery cannot accept any short peak if its charging path has a lower power limit.

Review profiles for different seasons, working days and weekends. Treat planned load growth as a separate scenario. For a new project, initial data can be refined through a site and consumption profile audit. Diagnostics of an existing solar plant and the scope of a retrofit review are agreed separately.

Use consistent time intervals and a verified measurement basis. Changes in shift patterns, production stoppages or other load modes affect coincidence with generation. Keep these events visible in the data rather than applying the results of one operating mode to the whole year.

Put energy flows and state of charge on the same timeline

Plot actual PV generation, total site load, battery charging and discharging, and grid exchange on a common timeline. Include battery state of charge at the start and end of each interval. Grid meter readings alone do not represent total demand where panels already supply part of the load behind that meter: grid imports and site consumption are different quantities.

Identify missing measurements, the time zone and the source of each series. Do not replace missing generation data with zero when the cause was a communications failure. For a proposed PV system, distinguish simulated generation from measured consumption. This makes the calculation reproducible and allows expected operation to be compared with actual results after commissioning.

An example balance for one hour

Consider a hypothetical one-hour interval. Potential solar energy is 80 kWh and simultaneous load is 50 kWh. Assume constant power during the hour: 80 kW of potential generation, 50 kW of load and 20 kW available for charging. The battery has sufficient free usable capacity.

All quantities are specified at the agreed AC boundary. Under these conditions the system can accept 20 kW × 1 hour = 20 kWh for charging. Of the initial 30 kWh surplus, 10 kWh remains. Its outcome depends on permitted operating modes.

Illustrative one-hour energy balance at the AC boundary
Interval measureHypothetical amountExplanation
Potential solar energy80 kWhBefore possible curtailment
Direct use50 kWhGiven the assumed coincidence with load
Accepted for charging20 kWhWith available power and capacity
Remaining surplus10 kWhExported or curtailed under the permitted mode

If the remainder may be exported, actual generation in the example can be 80 kWh. If export is prohibited and that remainder is curtailed, generation would be 70 kWh. Potential output must not be recorded as energy already generated.

Assume a 90% round-trip efficiency at the same boundary, including the agreed auxiliary consumption and a return to the initial state of charge. After charging and later discharging, the useful output is 20 × 0.9 = 18 kWh, with 2 kWh in losses. The 90% figure is an assumption, not a product specification.

This balance does not determine the required battery rating or describe annual operation. Check actual power within the interval and later demand. The article on losses and the cost of delivered energy explains efficiency boundaries in more detail.

If a later load requires 25 kWh while no solar generation is available, the 18 kWh above could cover part of that demand. Another available source must provide the remaining 7 kWh. This extends the same illustrative example: charging and discharging occur at different times and the required discharge power is assumed to be supported. Do not add the 20 kWh charging input and the 18 kWh output as two separate amounts of useful energy.

Which curtailed generation can be stored

First identify the cause of curtailment: an external grid export limit, converter capability, a full battery or another control condition. The same report label does not mean all these cases can be resolved by adding capacity.

Surplus affected by a grid export limit may be used for internal charging if the configuration, operating mode and available resources allow it. If the battery is full or charging power is exhausted, remaining potential generation may go unused. Each interval needs analysis.

Solar inverter power limits are a separate case. An AC-side battery cannot automatically receive energy that the inverter has not transferred to that side. A compatible DC-side configuration may have different capabilities, but these must be confirmed for the particular equipment and mode.

Estimate additional usable energy from topology, charging power, available capacity and future consumption. A calculation based only on panel and battery ratings can overstate the result. Distinguish a technical limitation from an economic decision not to generate or export.

Connection layout and compatibility

Generation and storage may be connected on the AC or DC side. The choice affects converter equipment, energy paths and available operating modes. It cannot be reduced to a universal claim that one configuration is always cheaper or more efficient.

For an existing solar plant, check the inverter model, permitted connections, battery compatibility, operating parameters, protection and controls. Panels and a grid-tied inverter do not prove that a battery can simply be added. A changed configuration may require different components and project solutions.

Possible configurations for discussion are described in hybrid systems. Selection is specific to the task. If power during an outage is needed, separately check the backup circuit, load power, compatible operating mode and switching. Energy storage alone does not prove standalone operation.

Energy management implements charging, backup and export priorities. Agree what happens when the battery is full, communications are lost or load changes. The algorithm must respect equipment and connection limits, not merely maximise daily charging.

For the selected Sungrow PowerStack 255CS-2H, request documentation for the supplied version and integration conditions. A product page helps formulate an enquiry but does not replace compatibility checks for the specific solar plant and its layout.

Connection, charging source and metering

Sharing a location does not determine all legal conditions. Identify the owners of generation and storage, the purpose of the installation and permitted import and export. Charging from the grid and from own generation may have different implications for contracts, support arrangements and commercial metering.

Where ownership differs, also check the contractual model, responsibility boundaries and separation of flows. A shared connection point for solar and storage does not make all installations one market participant. Determine who uses the infrastructure and how the relevant volumes are verified.

When adding a battery, do not automatically assume existing documents cover the new operating mode. The article on storage at an existing connection point explains the checks. Separately determine whether changed parameters, controls and approval of the layout are needed.

Metering must distinguish the required flows and energy sources. Grid energy stored in a battery does not become solar energy by passing through it. For facilities using support mechanisms, separately verify charging, export and settlement terms without applying one regime's rules to every solar plant.

How to calculate the economic effect

Compare two feasible scenarios: the facility operating without storage and with it. Account for direct consumption, charging, losses, purchases, sales and possible curtailment in each case. The difference depends on actual prices and contracts, not just the number of kilowatt-hours shifted.

Energy used to cover load after discharge may reduce purchases. That same energy cannot simultaneously generate full sales revenue. Where a surplus would otherwise have been sold, also account for the change in that revenue. Do not automatically treat charging from an owned solar plant as free.

Compare initial investment, maintenance, losses and capacity maintenance over the agreed period. Forecasts should include availability and changes in usable capacity. One favourable day does not establish annual savings, and hypothetical examples are not a business's actual results.

Report direct solar supply to the load, useful battery discharge and remaining grid purchases separately. The charging source matters: when some stored energy came from the grid, the entire battery discharge cannot be counted as solar supply. The share of PV generation used on site and the share of site demand met by solar have different denominators. They should not be presented as the same indicator.

State of charge must also carry forward between intervals. A model that starts every day with a full battery without accounting for the charging source overstates the available energy. Agree the emergency reserve separately from the capacity used to shift daily solar generation. The relationship between these tasks is discussed in the guide to solar system types and backup with a generator.

Information needed for the project

Prepare an agreed description of the facility and priorities. First define what storage must do: shift surplus, reduce purchases, manage export or back up specified loads. Where several tasks are required, allocate resources and check their compatibility.

  1. Compare profiles. Identify coincidence of generation and load and available surplus.
  2. Check the configuration. Agree power, capacity, layout and connection limits.
  3. Compare scenarios. Calculate useful output, costs and results under different conditions.
  • Time series for generation, consumption, import and export.
  • Equipment list, versions and connection layout.
  • Connection, ownership and required metering documents.
  • Charging and backup priorities and critical loads.
  • Contracts, energy costs, budget and operating assumptions.

Selection can then be based on a verified operating scenario. The solution should explain which energy the battery will actually accept, when it will deliver it and what task this solves, without universal promises of savings or autonomy.

Frequently asked questions about solar power with battery storage