In a solar plant financial model, the way future amounts are expressed must match the discount rate. Real cash flows in constant purchasing power use a corresponding real rate; nominal flows that include general inflation use a corresponding nominal rate. With the same underlying assumptions, the two methods should produce the same present value.

This is a consistency check, not a forecast of inflation or electricity prices. A company's purchase price can change differently from general inflation. All figures and rates below are invented; taxes and financing are excluded. An actual decision needs site-specific evidence and professional assessment.

Record the model basis

Start with the date, currency, horizon and cash flows included. Identify which amounts relate to the solar plant itself and which relate to financing. Compare the same boundaries and dates: otherwise different results may reflect a different scope rather than inflation.

A nominal amount is the quantity of money at a future date under stated assumptions. A real amount expresses it on a common price basis. Label the base year, currency and how each row changes over time. Do not call an entire model real if some prices rise nominally without a corresponding conversion.

The business solar payback model starts with demand profiles and annual cash flows. This article checks a separate step: whether the inflation basis and rate are consistent once those flows have been constructed.

Link the two rates

For a chosen annual real rate r and assumed general inflation i, the corresponding nominal rate n is defined by 1 + n = (1 + r) × (1 + i). The reverse conversion is r = (1 + n) / (1 + i) - 1. Enter rates as fractions: 10% is 0.10.

For example, an assumed real rate of 10% and inflation of 10% give a nominal rate of 1.10 × 1.10 - 1 = 0.21, or 21%. Simple addition would give 20% and omit the product of the two rates. These values are educational; they are neither a Ukraine forecast nor a recommended business rate.

The discount rate must also fit the currency, risk and perspective of the cash flow. Consistency in inflation treatment does not prove the chosen rate is appropriate. A financial specialist should support that choice for the actual project.

Reproduce two equal valuations

Imagine two identical real net solar cash flows of UAH 100,000 at the end of each of years one and two, expressed at base-date prices. This is a partial teaching example after fictional operating costs. Initial investment, taxes, debt, generation changes, residual value and other possible payments are excluded.

Assume general inflation of 10% each year and a 10% real rate. For this example every component of the hypothetical cash flow rises nominally exactly with the general index. Nominal cash flows are therefore 100,000 × 1.10 = UAH 110,000 in year one and 100,000 × 1.10² = UAH 121,000 in year two.

YearReal cash flow, UAHNominal cash flow, UAHReal rateNominal rate
1100,000110,00010%21%
2100,000121,00010%21%

On the real basis: 100,000 / 1.10 + 100,000 / 1.10² is approximately 90,909 + 82,645 = UAH 173,554. On the nominal basis: 110,000 / 1.21 + 121,000 / 1.21² is approximately 90,909 + 82,645 = UAH 173,554. Before rounding, totals match because both flows and rates were converted consistently.

This is not NPV for the whole project, as the initial investment and other flows are omitted. The assumption of a constant real flow does not describe an actual plant. It is used only to check the two formulas.

See what mixing bases does

If the nominal UAH 110,000 and UAH 121,000 are incorrectly discounted at the real rate of 10%, the result is 110,000 / 1.10 + 121,000 / 1.10² = 100,000 + 100,000 = UAH 200,000. That is about UAH 26,446 more than the consistent result of UAH 173,554 in this example.

The difference comes from inconsistent bases, not better generation. Mixing them in the opposite direction also distorts the result. Before comparing figures, check dates, the inflation index, rate and whether both methods contain the same costs.

Keep nominal and real calculations side by side in the spreadsheet, avoid rounding intermediate values and check cell references. If results differ on the same basis, find the reason before relying on the total. Applying inflation twice to one row also changes the outcome.

Check different rates across years

One inflation rate for the entire horizon is an assumption, not a requirement of the method. If rates vary by year, multiply the annual indices in sequence to convert a future amount to the base date. Align the corresponding nominal discount rate with the real rate and inflation for each period. Do not raise the second-year rate factor to the second power when the first-year rate differs.

Separate from the previous example, assume inflation of 10% in year one and 5% in year two, with a 10% real rate in both years. The corresponding nominal rates are 21% and 15.5%. A real cash flow of UAH 100,000 at the end of year two is nominally 100,000 × 1.10 × 1.05 = UAH 115,500. Its present value is 115,500 / (1.21 × 1.155), approximately UAH 82,645. The same value follows from 100,000 / 1.10². These invented figures are not an inflation forecast.

Keep each year's index, discount factor and assumption source in the file. If the real rate also varies, multiply the corresponding annual factors separately. Set different growth assumptions for individual costs or the electricity price in their own rows, then convert each amount to a common price basis using the general index.

Do not equate price changes with inflation

An enterprise's electricity purchase price depends on its agreements, bill structure and actual terms. In the model it is an assumption separate from the general price index. Nominal electricity price growth of 10% with general inflation of 10% means a constant real price only under those stated assumptions.

If energy prices grow differently from the general index, the real price also changes. For example, with fictional nominal price growth of 12% and general inflation of 10%, the ratio is 1.12 / 1.10 - 1, approximately 1.82% real growth for the year. This is arithmetic sensitivity, not an electricity price forecast.

Operating, repair and insurance costs can likewise have their own assumptions. Do not apply one percentage to every line without explanation. First examine contract scope and supporting evidence, then convert each forecast to a consistent basis.

Separate the net flow into components

Suppose the first-year real net UAH 100,000 consists of fictional savings of UAH 140,000 and costs of UAH 40,000. If both rise nominally by 10% with the general index, they become UAH 154,000 and UAH 44,000. The difference is again UAH 110,000.

This breakdown can reveal an error where price escalation was added to savings but omitted from costs or applied twice. Actual components may change at different rates. Forecast each separately and convert to a common basis rather than forcing a constant real net flow.

Do not put the entire electricity bill in the savings row. Fixed and variable charges may respond differently to own generation. Identify the charge displaced by each kWh in the relevant interval and keep unavoidable payments in both scenarios.

Run two more formula checks

Set inflation to zero while retaining other assumptions. The corresponding nominal rate then equals the real rate, and nominal and real amounts match. For the two real flows above both methods remain approximately UAH 173,554. This checks arithmetic and is not a forecast.

Next inspect timing. A payment at the end of year two uses the second power of the factor. Placing it in year one changes present value even with correct rates. Restore actual dates before analysis; irregular dates may need a different time step.

After checking formulas, review the origin of rates and forecasts and whether they fit the owner's or entire project's perspective. Mathematical equality does not prove that inputs are reliable. Keep the scenarios and identify which assumptions still need evidence.

Separate price from useful energy

Cash value depends not only on price but also on how much generation displaces purchases in the relevant intervals. Annual generation multiplied by an average bill price does not always show that quantity. Check load, possible restrictions and variable charges under the actual agreements.

If a model changes generation, direct-use share and price at once, show each effect separately before analysing their combination. Do not describe an arbitrary combination as an exact forecast. Align initial expenditure with the solar budget on the same tax and currency basis.

If the source data cover an incomplete year or an unusual shutdown, flag that before calculating. A correctly discounted price cannot repair an error in the useful generation forecast. Ask the responsible team to distinguish measured from estimated intervals and explain how the selected data relate to the business operating schedule.

Audit the file before a decision

ControlQuestion for the model
DatesSame periods and base date?
Cash flowsReal or nominal, with identical scope?
RateConsistent with currency, basis and risk?
Energy priceWhich component changes and why?
CheckDo the two converted results match?

Keep sources, assumption dates, formulas and owners. If the horizon, flow or rate changes, update both versions and explain the difference. A financial specialist should assess the complete model, including taxes, financing and risks, before an investment decision.

For technical inputs to a separate financial assessment, explore solar services.

Questions about inflation in a solar model

Ready for energy independence?

Get a free consultation and individual calculation for your business.