Table of Contents

A ventilation system can run at the same time as a solar photovoltaic (PV) system, but its operating schedule must follow the need for safe air exchange, not the availability of sunshine. To assess solar's contribution, first measure the electricity used by the actual ventilation equipment and compare it over time with generation and the building's other loads. Separately establish which operating modes the design and responsible specialist permit.

This guide helps an energy manager and the facilities team prepare a shared worksheet for that discussion. It does not set ventilation rates, authorize changes to controls or replace an inspection. Medical, hazardous and other special spaces require a separate assessment of the requirements applicable to the actual facility.

What belongs in the ventilation load

List the systems by zone and purpose: supply, exhaust, local process extraction, sanitary exhaust or other equipment. One room can depend on several fans, while a single unit can serve multiple zones. Record which units are interdependent and which have their own electrical panel or meter.

Do not rely on the rated power on a single motor's nameplate. Depending on the measurement boundary, a unit may include supply and exhaust fans, controls and other electrical components. Show electric heaters or cooling equipment separately where they can be reliably distinguished. This makes the comparison transparent and helps prevent the same load being counted twice.

For each zone, record its purpose, actual operating hours, connected processes, special modes and responsible person. Mark ventilation that serves occupants, captures contamination at its source or maintains production conditions. Two fans with the same electrical rating do not necessarily offer the same operational flexibility.

Establish air requirements before energy scenarios

Find the design documents, operating instructions and maintenance log. Establish which modes are permitted when the zone is occupied or unoccupied, which alarms and interlocks take priority, what happens if a sensor fails and who is authorized to change settings. For local extraction, account for the process operating period and any residual emissions after it stops.

The need for outdoor air, contaminant removal and suitable airflow direction does not disappear when solar generation falls. Do not stop a fan, reduce its airflow or bypass a protective function simply to follow PV output. Carbon dioxide concentration alone does not describe every industrial contaminant. Sensor types, locations and responses to failure depend on the system and a professional assessment.

If automatic modes already exist, check whether they actually work. A controller's schedule may no longer match the calendar, a sensor may read incorrectly, and a damper may not move as commanded. A qualified responsible team should perform testing and adjustments. Adding solar generation is no reason to ignore a ventilation fault.

Prepare the measurement

Ask an electrician to identify safe metering points and the equipment included at each point. Collect ventilation load, total site consumption and generation data using matching time intervals. Alongside electrical values, retain equipment status, production calendars, zone occupancy and weather. These notes help distinguish a change of operation from a fault or an unusual event.

Power in kilowatts describes a rate at an instant or an average over an interval. Energy in kilowatt-hours accumulates over time. An average power for one hour multiplied by one hour gives that interval's energy. When using an energy meter, subtract adjacent readings and check the units and timestamps.

Plan representative working days and weekends, and compare seasons when possible. One sunny day shows neither the annual overlap nor cloudy-weather behaviour. Mark missing readings, restarts and maintenance periods instead of silently filling gaps with assumptions. If seasonal records are unavailable, say so in the conclusion.

Check data quality before calculating

First confirm that every series uses the same time zone and interval length. Half-hour generation and hourly consumption do not become comparable merely because their labels look similar. Aggregate to a consistent interval and retain the original readings so another person can reproduce the result. Record whether each timestamp identifies the beginning or end of its interval.

Check whether the building meter already includes ventilation and whether it records gross site consumption or only net exchange with the grid. These are different quantities. If only net exchange is available, do not combine it with generation until the meter boundaries, direction and recorded flows have been checked. Pay particular attention to outages and periods when generation was limited.

For an initial analysis, keep a log with date, interval, unit status, ventilation consumption, building load, generation and unusual events. Compare the sum of intervals with the energy meter's reading for the same period. A discrepancy may indicate a gap, a unit error or a different measurement boundary. If it remains unexplained, mark the conclusion as preliminary rather than hiding it through rounding.

Ask the facilities team whether measured days reflect normal operation. A closed wing, temporary production, faulty sensor or maintenance work may explain an unusual profile. Several labelled day types are more informative than one average curve that conceals their differences.

Compare measured states of the same system

Make a record for each zone and identify its connection to supply and exhaust equipment. For each interval record occupancy, process operation, permitted system state, actual status of both fans and each fan's electricity if metering permits. Add verified air measurements and pressure differences where these are used to assess that system. A control command, damper position and confirmed airflow are not interchangeable records.

Linked supply and exhaust belong inside the same assessment boundary even when supplied from different panels. Compare the diagram with the meters: if a total meter already covers both motors, use individual readings to explain that total rather than adding them again. Identify heating, cooling and recovery separately where they fall inside the assessment. Airflow and electricity measure different things: lower kWh alone does not establish equivalent service.

Compare the same verified states: the same zone, occupancy and process, comparable weather, filter and equipment condition, and approved criteria for air service. A specialist determines the readings and tests needed to establish those criteria on site. Include preparation and operation after a process ends where required. Missing measurements or an unverified state mean equivalence has not yet been demonstrated.

Hypothetical example: the same zone work at different hours

Imagine one zone where the same work, with the same number of occupants and the same output, could take place either from 08:00 to 10:00 or from 10:00 to 12:00. Assume both windows have already been approved for the whole process and ventilation, including any necessary preparation and post-process operation. This is an instructional assumption, not a finding about a real system. If additional hours before or after the process are required, include them in both plans and recalculate. In both plans, supply and exhaust together run in a verified occupied state for two hours and in a separately permitted unoccupied state for the other two hours.

Invent average electrical powers for the fan pair: in the occupied state supply uses 3 kW and exhaust 2 kW; in the unoccupied state each uses 1 kW. For each one-hour interval the pair therefore uses 5 or 2 kWh respectively. Other building loads hypothetically use 5 kWh each hour. Weather, equipment and other system consumption are assumed equal. The table shows the whole building including ventilation; it is not a recommended operating mode or equipment specification.

HourState A / BBuilding A, kWhBuilding B, kWhPV, kWhOverlap bound A / B, kWh
08:00-09:00Occupied / unoccupied10722 / 2
09:00-10:00Occupied / unoccupied10744 / 4
10:00-11:00Unoccupied / occupied710107 / 10
11:00-12:00Unoccupied / occupied71087 / 8

Each plan uses 2 × 5 + 2 × 2 = 14 kWh for the pair and 4 × 5 = 20 kWh for other loads, for a total of 34 kWh. Hypothetical PV generates 24 kWh. The sum of hourly minima is 20 kWh for plan A and 24 kWh for plan B. These are overlap upper bounds, not exact simultaneous consumption or savings: profiles can fluctuate within each hour. The 4 kWh difference excludes losses, storage, export, the rest of the day and cost.

Both plans assume the same confirmed air service in each corresponding state. Actual equivalence cannot be established from kWh, time or a controller command alone. If the same system serves other zones, check their schedules and states during both windows. Without approval or measurements, plan B remains a hypothesis. Do not move an individual fan to reproduce the example.

Which scenarios should be compared?

The first scenario keeps a functioning, agreed ventilation mode unchanged and assesses how much of total demand overlaps generation. A second may describe correction of an identified fault or erroneous schedule, but only after technical verification. A third is possible only if a specialist has defined a specific safe operating window and the conditions for using it. Do not treat that window as available before it is checked.

Compare scenarios using the same data and conditions: required air exchange, operating hours, electricity, effects on heating or cooling the air, available controls and responsibility for monitoring. Do not assess a fan in isolation if changing airflow affects other equipment. Financial conclusions require actual prices and a separate set of agreed assumptions.

An apparent surplus during certain hours is not a reason to increase ventilation unnecessarily or move a process. Equally, a lack of sunshine does not mean air exchange can be reduced. People, processes and the requirements of the specific building determine the operating mode. For the wider load profile, see the guide to commercial solar sizing from a load profile.

What to give the project team

Collect the list of equipment and zones, an electrical single-line diagram or description of measurement boundaries, time series, operating calendars, gaps in the records and documents showing current setpoints and interlocks. Include unresolved questions: who confirms airflow limits, whether alarms are independent, how actual airflow is verified and which team will test the system.

Agree and record the baseline before any change and preserve a way to return to it. After approved work, check actual airflow, signals, consumption and response to sensor failures separately. As a next step, discuss the input data with the ONG Solar services team. The responsible site specialists and contractor decide settings for the particular system.

Questions about solar and ventilation