Compare power, usable energy, full budgets and project readiness on the same basis.

7 min read

Read articleBack to catalogue
Two battery cabinets, one dark and one light gray, a white tablet with two columns of marks and a magnifying glass on a white background.

In this article

Comparing energy storage projects starts with the same objective, system boundaries and calculation conditions. Power, usable energy, full budget and cash flows must describe the same outcome. A lower battery price or higher percentage in a presentation does not establish which solution better meets your site's needs.

This article brings offers to a common basis, identifies missing data and suggests questions for suppliers. It covers technical measures, costs, financial assumptions and project readiness. The arithmetic example is educational and contains no market prices or return forecasts.

Start with the same objective

State what the installation must deliver: shift own generation, export energy at specified times, reduce peak demand or back up agreed loads. Each task needs its own criteria. A large battery alone does not prove autonomous operation or the required switching time.

Define site constraints, available charging and delivery power, load profile, required duration and acceptable interruptions. The project preparation checklist can help. Give all participants the same versioned input package.

Assess variations in the task separately. For example, two-hour and four-hour storage scenarios may differ in capital cost, operating modes and uses. Select configurations first, then compare offers for each.

Use consumption and generation time series with enough detail for the task. Annual volume does not show when charging or delivery is possible. Check missing data, changes in operating schedules and seasonality: different input quality can produce different results even for identical equipment.

Put measures on one comparison sheet

Distinguish installed power from net power available at the agreed point. Converter-terminal output is not always site output. Grid limits, transformer, cables, auxiliary use and actual operation all matter.

For energy, establish whether the figure is nominal battery capacity on the DC side or usable AC delivery. DC and AC describe different sides of the system. Compare under the same temperature, power, permitted charge range and point in service life.

A common basis for comparing offers
MeasureWhat to alignWhat to check
PowerNet output at one pointCharging and export limits
Usable energySame AC boundary and conditionsInitial and later available volume
EfficiencyFull cycle with the same boundariesLosses and auxiliary consumption
Cost scopeFull scope to agreed readinessExclusions, replacements and service
EconomicsCommon horizon and cash-flow typePrices, taxes, debt and discounting
ReadinessSame final outcomeDocuments, owners and acceptance

Identify the basis of every value: client requirement, contractual guarantee, test result or calculation assumption. If data is absent, leave the issue open. An approximate unexplained number creates false precision and can change the conclusion.

For round-trip efficiency, clarify initial and final state of charge, measurement point and treatment of auxiliary use. A converter and a whole installation encompass different losses. Likewise, do not compare new-system characteristics with guaranteed end-of-life characteristics without explanation.

Example: same power, different usable output

Assume a requirement to deliver 1 MW for two hours. In this educational example, option A has 1 MW net power and 2 MWh usable energy; option B has 1 MW and 1.8 MWh. Both energy figures use the same AC boundary at the beginning of operation, under identical conditions and with agreed treatment of auxiliary use.

At constant power, duration is usable energy divided by power. For A: 2 / 1 = 2 hours. For B: 1.8 / 1 = 1.8 hours, or 108 minutes. Under these assumptions A meets the two-hour requirement and B does not fully meet it.

If option C only states 3 MWh nominal DC capacity, that is insufficient for the conclusion. Usable AC delivery, net power and relevant conditions are needed. Do not multiply already established usable AC output by round-trip efficiency again.

The example tests one requirement under stated conditions. It does not identify the better investment, account for future degradation or establish backup capability. For a real choice add requirements for later years and assess other modes.

Compare the full cost scope

Equipment price and a ready site's budget cover different scopes. Check storage components, controls, protection, cooling, grid equipment, construction, delivery, integration and testing. Assign funding and execution for every exclusion.

The equipment catalog helps identify models and component scope. A product specification does not replace a whole-system guarantee. Do not substitute solar module power or another battery's characteristics in the system comparison.

Bring offers to the same date, currency, tax basis and scope. Clarify whether design, connection, auxiliaries and contingency are included. Show provisional work separately from confirmed prices.

Compare operating costs for service, software, insurance, communications and replacements. Extra modules to maintain capacity may be in annual costs or separate payments. Include them once in the relevant years and align the cost with the available-energy forecast.

Check financial measures and assumptions

Annual gross margin divided by initial investment is not net return over the operating life. It may exclude service, taxes, financing and capacity change. Compare payback measures and cash flows with the same definitions.

Net present value (NPV) shows discounted cash-flow results, internal rate of return (IRR) describes relative return, and payback characterizes investment recovery under the selected method. No one measure replaces the others. Distinguish project cash flows from owner cash flows including debt.

Align horizon, currency, inflation, taxes, discount rate, residual value and payment dates. For costs per unit of energy delivered, consider levelized storage costs and losses. Treat charging, losses, replacement and delivered-energy denominator consistently. Initial price divided by one cycle's capacity is not LCOS.

Compare base and adverse scenarios under the same external assumptions. Test a narrower price spread, delayed launch, higher costs and lower availability. Revenue from different services must match the actual allocation of power and energy without using the same resource twice.

For different scales, also check absolute investment and additional capital needs. Higher IRR for a smaller option does not mean greater total value. If a small assumption change reverses the ranking, show this in the decision and refine that parameter.

Compare warranties and actual readiness

Review warranties, degradation and service under the same operating mode. Consider throughput, permitted cycles, temperature, remaining capacity, exclusions and remedies as well as years. Clarify testing and responsibility.

A ready site and a right to future work have different value. Perform project acquisition due diligence: validity, configuration, obligations and whether prior results can be used. An unconfirmed stage is not complete.

Compare the project schedules to the same result. Delivery, installation, acceptance and readiness for the intended operations can have different dates. An outstanding prerequisite affects funding needs and the operating forecast.

Clarify operational availability: assessment period, planned downtime, exclusions and event-log access. Service response time is not restoration time. Compare the impact on your task and actual contractual obligations.

Record the decision and open questions

Before concluding, check whether the comparison can be reproduced from the supplied materials:

First distinguish mandatory requirements from desirable advantages. A failure to meet power, safety or compatibility requirements should not be offset with points for convenience or low price. The ranking should explain client priorities and keep open questions visible.

  • One objective and outcome requirement is agreed for all options.
  • Power and usable energy use the same boundaries and conditions.
  • Scope, exclusions and future payments are included without duplication.
  • Financial models use aligned assumptions and scenarios.
  • Unconfirmed data, risks and clarification owners are recorded.
  1. Align the basis. Agree requirements, units and project boundaries.
  2. Recalculate options. Check the same scenarios and constraints.
  3. Agree the next step. Obtain missing evidence and record the conclusion.

The decision should explain which option meets your task, under what conditions and what remains to be confirmed. Retain the comparison sheet and inputs by version so later offer changes remain visible.