A business backup power kit should be selected for the simultaneous load, required runtime and connection conditions. A “3 kW” or “5 kW” label does not by itself explain how much energy is in the battery, which circuits will remain powered or whether the system can recharge before another interruption. Compare the complete scope and calculations for your own site, including a site in Kyiv.
What should the kit include?
A stationary solution may include an inverter charger, compatible battery, switching and protection equipment, cables and installation materials. But the word “kit” does not define a universal bill of materials. One offer may contain only the inverter and battery, while another may include design work, a backup distribution board, configuration and commissioning. Request quantities, full model numbers and clear boundaries for the work.
Start with the loads that must remain active rather than a number on the box. For a small office these might include communications, workstations and lighting. A shop may also need its checkout and the equipment required to complete a transaction. Each site has different needs. Record simultaneous operation, duration and dependent devices, such as network equipment needed by the checkout.
Separate loads that must continue without interruption from those that can tolerate a short break or are outside the backup scope. Check phase requirements and starting conditions. A solution for one group of loads will not necessarily supply the whole building. For each option, ask for a diagram showing backed-up circuits and behaviour during normal supply and an outage.
| Question | What the offer should state | Why it matters |
|---|---|---|
| Power | Continuous active and apparent power and short overload limits | Compare running and starting duties |
| Battery | Nominal and available energy, discharge limits and conditions | Estimate runtime for the specified load |
| Charging | Permitted charging power and expected profile | Check readiness for another outage |
| Transfer | Backup outputs, transfer time and return conditions | Assess sensitive loads |
| Installation | Boards, cables, protection, work and testing | See full cost and responsibilities |
How to read 3 and 5 kW labels
Kilowatts describe active power, while kilovolt-amperes describe apparent power. These labels are not interchangeable in an offer. Compare continuous values at the actual backup output under the manufacturer's conditions, as well as current, temperature and the duration of any permitted overload. A peak figure does not mean the system can sustain that power for its whole runtime.
For example, the global datasheet for the Victron MultiPlus-II 48/3000/35-32 230V lists continuous output at 25 °C as 3000 VA and 2400 W. For the MultiPlus-II 48/5000/70-50 230V the same document gives 5000 VA and 4000 W at 25 °C. These are examples of specific inverters, not ratings of every kit with 3 or 5 in its name. The document does not confirm their availability or sales terms in Ukraine.
Even when an offer correctly states 3 or 5 kW of continuous active power, the battery and other components must support the required duty. A motor, compressor or other load can have a starting condition different from steady operation. Do not add short peaks at random or treat an advertised overload as a guarantee of starting. The actual load data, start duration and limits of the complete configuration are needed.
For example, if a hypothetical group of loads needs 1.2 kW continuously, choosing a 5 kW inverter instead of a 3 kW one does not by itself increase the energy stored in the same battery. Higher power may be needed for simultaneous loads or starting, but this must be supported by a calculation. A three-phase building supply also does not turn a single-phase backup output into a three-phase output.
How to compare two ready-made kits
Imagine two offers: one states 3 kW of continuous active power and the other 5 kW. Both include a battery with the same nominal energy. If the agreed load is 1.2 kW, first ask each supplier to confirm continuous operation, all starting duties and the battery's actual available energy. Without these details, the larger number on the second kit does not explain its value for the stated task.
Next check whether both offers use the same assumptions: the same circuits, required runtime, temperature and state of charge. If one includes installation and a backup board while the other does not, add the missing items to the comparison or mark them unknown. If the business plans to increase its load, request a separate future scenario and compatible expansion. Do not assume expansion is possible simply because the inverter is larger.
The choice remains open in this example. The smaller kit may be sufficient if all duties are confirmed, while the larger one may suit an agreed expansion or starting requirement. The answer depends on documentation and the full site-specific price, not the number on the label. Our guide to high-voltage and low-voltage batteries explains the different battery interfaces.
How long will the battery last?
A kilowatt-hour describes energy over a period of time. Nominal battery energy is not automatically the energy delivered to the load. Permitted charge range, condition, discharge power, temperature and system losses all matter. For a comparison, ask whether available energy is stated at the battery boundary or already at the AC output.
Consider a hypothetical battery rated at 51.2 V and 100 Ah. The product 51.2 × 100 = 5120 Wh, or 5.12 kWh, is nominal energy under these assumptions. Assume for this example that 80% is available at the battery boundary and conversion efficiency remains at 90% throughout discharge. Energy at the output is 5.12 × 0.80 × 0.90 = 3.6864 kWh.
If the load is constant at 1.2 kW, the simplified calculation 3.6864 / 1.2 gives about 3.07 hours. At 2.4 kW, the same assumptions give about 1.54 hours. This is a fictional teaching example, not a datasheet, guarantee or customer forecast. It does not separately account for standby consumption, changing efficiency, ageing, temperature limits or starting currents. The actual available share and efficiency can differ.
Changing the inverter label to 5 kW in this example, without changing the battery and other assumptions, does not increase the calculated 3.6864 kWh. Extra power does not mean the battery can deliver the corresponding current, however. Permitted discharge, battery-to-inverter control compatibility and protection require verification. Compare offers for the same load and defined initial state of charge.
Will the kit recharge in time?
After external supply returns, the charger operates within the limits of the battery, grid connection and its own settings. Having a charger does not mean it charges continuously at its maximum datasheet power. Other loads, temperature, battery state and battery control behaviour affect the process.
In a separate hypothetical example, suppose 3.2 kWh must be returned to the battery at its DC boundary and the average power actually reaching it throughout the process is 1 kW. The arithmetic is 3.2 / 1 = 3.2 hours. This is not a datasheet time or a calculation from the wall socket. Input losses, changes in power across charging stages and grid limits are not determined here, and the assumed average power itself needs verification.
If the grid window is shorter than the necessary time, the energy reserve may not recover before the next interruption. Ask the supplier for a forecast using the actual initial charge and permitted profile. State the connection power limit and loads operating at the same time. Do not change current settings or protection yourself to speed up charging.
Transfer, protection and installation
Automatic transfer does not necessarily mean an interruption is imperceptible to the load. Ask for the exact conditions and transfer time, outputs that remain active and behaviour when the grid returns. For critical controllers and computers, check the requirements of those devices. Our guide to a UPS and a backup inverter helps compare power paths and transfer.
The connection scheme needs its own design: which circuits are backed up, how sources interact, how unwanted energisation is prevented and which protective devices operate in each mode. Cables, protection, earthing and equipment location are selected for the specific devices, site conditions and applicable requirements. Do not connect a stationary source to a building network with a homemade cable.
Check whether the quotation includes a backup board, cabling, switching and protection devices, configuration, battery communications checks and testing. Identify construction work, access conditions and anything the customer must provide separately. The cost of equipment alone cannot be compared directly with a fully connected system.
What to accept after installation
Before work begins, agree outage conditions, responsible people and test criteria. Request the as-installed connection diagram, models and manuals for installed equipment, and a list of backed-up circuits. The acceptance programme should cover normal operation, transfer to backup, return of external supply, charging and available alarms. A responsible team performs the tests without creating dangerous faults.
Confirm the state of charge and load used for a runtime test, how the result is recorded and what an incomplete test means. One successful test does not guarantee identical runtime under all future conditions. Request operator instructions, service contacts and written warranty terms for the actual supply in Ukraine. Leave missing documents or unconfirmed compatibility as open items.
To compare kits, prepare the load list, required runtime, grid limits, room plan and desired charging window. Provide these for a solar project design discussion with possible backup. Batteries and backup circuits are included when agreed in the brief. Supply, installation and service scope are agreed separately for the particular site.