Start with whatever stops when the power goes out. That might be dispatch at a warehouse, temperature control in a cold room or internet access for the whole team. For each critical process, agree how long it can be down and who decides when to switch to backup. This gives you a practical basis for deciding whether you need power across the site or only on the circuits that keep the shift running.
Use 30, 90 and 180 days as planning milestones. Spend the first month gathering data and agreeing how people should respond. Next, define and verify an initial backup circuit. By the six-month review, you should have enough information to decide whether a larger system makes sense. Delivery, installation and testing dates depend on the site and the work required.
The first 30 days: decide what needs to stay on
Ask each shift lead which process causes the biggest problem when power fails. At a warehouse it may be access to the dispatch system. A workshop may need to finish an operation already under way. A shop may need to protect stock in a cold room. Ask what else each process depends on. Keeping a computer powered will do little for dispatch if the router, scanners or loading doors are on circuits that lose power.
Group processes by how they can tolerate an outage. Some need to keep running through the changeover. Others can restart once backup power is available. The rest can wait for the grid to return. Write down the maximum acceptable interruption for each process. A requirement such as keeping the cold room in its operating range until the end of the shift is a better starting point for a supplier discussion than asking for a big battery.
Keep a log of actual outages. Record the date, the time the grid went down and came back, what the shift was doing, what equipment stopped and when the team could resume work. If it took 20 more minutes to restart after power returned, record that as well. Outage duration and downtime tell you different things. The first helps define the hours of backup needed. The second captures time lost while the team starts up again.
The engineer will need measured power demand on the selected circuits and details of equipment that may start or run at the same time. A monthly bill gives you an overall energy total. It cannot show what the backup source needs to deliver during a changeover. Use existing metering or arrange measurements with your electrical specialist. Leave any work inside electrical panels to qualified personnel.
By day 90: verify the first backup circuit
Agree a reduced operating mode that the shift can use during an outage. A warehouse, for example, might maintain cold storage and keep processing orders while taking some conveyors out of use. Give every backed-up circuit an owner who can confirm it is ready. Record which equipment the team should leave off while running on backup and make sure that information reaches the people who will be on shift.
Check what existing equipment can contribute. You may already have an uninterruptible power supply for communications, a generator or a battery system. Ask the engineer which circuits each source can serve, what should happen when the grid fails and returns, and how the system restores its energy or fuel reserve. If the site already has solar, check whether its design allows it to operate without the external grid and under what conditions.
Agree the test scenario before accepting any work. The shift team should say what counts as recovery. For dispatch, that could mean a worker can process an order and release it for collection. A qualified specialist runs the agreed test, and the operations lead records the timing, result and any problems. If equipment restarts unexpectedly or staff cannot tell whether backup is active, assign an owner to fix it and agree when to run the test again.
If you need to buy equipment at this stage, check what the supplier includes and what work your business will still have to arrange. The guide to choosing a business backup power kit will help you review the scope and prepare questions about the quote.
Example: two outages in the same shift
Suppose the backed-up circuits at an example warehouse draw an average of 4 kW during each outage. An outage lasts two hours. The grid returns for 45 minutes, then fails again for one hour. The loads require 8 kWh of energy during the first outage and 4 kWh during the second. These illustrative figures are for energy delivered to the loads and leave out system losses, auxiliary consumption and brief starting peaks.
Suppose the short charging window restores energy available at the output at 3 kW after losses. In 45 minutes the system adds 2.25 kWh to the usable output reserve. At least 9.75 kWh of usable energy must therefore be available before the first outage: 8 + 4 − 2.25. If no energy can be restored between outages, the two interruptions require a total of 12 kWh.
The example gives the engineer something specific to verify: how much reserve can be restored while the site is operating. Selecting equipment still requires checks on charge limits, short peaks and conditions at the required output. The guide to storage power and energy capacity explains what to look for in those figures.
By day 180: decide whether to expand
Once you have results from the first test, give each supplier the same brief. Describe the processes and circuits in scope, how long they must run, how much interruption they can tolerate during changeover, the sources already on site and typical gaps between outages. Ask what operating modes the quote covers and what site work is needed first. Include a scenario in which the system enters the second outage with a partly replenished reserve.
Ask what each proposal buys you. One may reduce downtime. Another may keep selected circuits operating longer, reduce the electricity you buy during the day or do both. Compare the full scope, ongoing maintenance and who responds if the system fails. If you plan to use the battery for routine operations as well as backup, agree the minimum amount of energy that must be set aside for outages.
Record the decision and what would cause you to revisit it. You might keep the initial circuit, add another source or extend backup to a specific process. A second shift, a new cold room or a failed test under the agreed conditions could justify taking the proposal back to the budget owner. This gives you a defined reason to invest when the need arises.
What completion looks like at each milestone
| Milestone | Who leads | What to produce |
|---|---|---|
| 30 days | Operations lead and person responsible for metering | Outage log, list of critical processes and maximum acceptable downtime |
| 90 days | Electrical lead and shift supervisor | Agreed backup circuit, changeover scenario and test record if equipment is ready |
| 180 days | Business lead and finance team | Comparable proposals and a budget decision or criteria for revisiting it |
At a small business, the same person may cover several roles. Give every outcome an owner and a review date. Before moving to the next stage, take a few minutes to discuss the log with the people who worked through the outage. They may have spotted a dependency, such as a network switch on a different circuit, that never appeared in the equipment list.
An outage log you can copy
Use one row per event: date and shift / grid outage started / grid power returned / work resumed / processes affected / duty lead / what needs checking. Mark repeat outages and record the time available to recharge in between. If work has yet to resume, leave that time blank and fill it in later.
Keep routine and difficult events in the same log. An outage at the start of a shift can have a different impact from an equally long outage late in the day. Before meeting the engineer, pick one typical event and the one that caused the most disruption. Note what the team could still do and what had to wait.
What to bring to the first engineering discussion
Put the site address and facility type, shift pattern, recent outages and critical processes on one page. Add details of any generator, battery or solar installation and attach an electrical drawing if you have one. Separate actual readings from values that still need checking. The same short brief will help you compare proposals against how the site runs and what you need to keep operating.
Talk to ONG Solar about backup power for your site. Share your outage log and priority circuits so the first discussion can identify what information you still need to compare options. If solar with backup is part of the plan, a site audit can assess consumption, connection conditions and where equipment could go.