Fronius GEN24 Meter Placement
Technology

Fronius GEN24 Meter Placement

Choose the primary meter boundary and decide where a secondary meter adds useful detail to a commercial PV report.

ReadAll Articles
Solar inverter, two power meters and an electrical distribution board on a light background

Table of Contents

In a Fronius GEN24 system, the primary meter has a defined electrical position. At the grid boundary it measures exchange across that boundary. In a consumption branch it measures the loads supplied through that branch. A secondary meter can provide a separate profile for a workshop or generator. When a commercial solar site adds a tenant, inverter or distribution board, match the drawing, configuration and purpose of each report before revising the equipment schedule.

What the primary point covers

Find the point on the single-line diagram where energy from the public grid can flow to the site's loads and where its generators connect. With a primary meter at the grid boundary, exchange between the grid and each included branch passes through that point. Separate grid connections or busbar sections can change which circuits are included. The words “main distribution board” on a label are insufficient to establish how all the sections are connected.

For a meter in a consumption branch, start with the outgoing circuits it covers. Identify the workshop, office, ventilation and other loads downstream of that point. List any loads whose supply bypasses the branch. A daily workshop report and a whole-site report need distinct names even when they are delivered through the same inverter and account. Otherwise, a manager could use the workshop figure when preparing a site-level request for more capacity.

The Fronius Smart Meter TS 65A-3 instructions illustrate both primary positions in the applicable GEN24 layouts. Position is a configuration choice on the GEN24, and the setting needs to match the physical location. If the drawing, board labels and configuration indicate different points, send the discrepancy to the responsible specialist. Changing a position label in a configuration does not move the electrical branch through the meter.

What a secondary meter adds

The TS 65A-3 documentation describes secondary meter categories for a load or producer. For example, if the operations team wants to investigate refrigeration peaks, the refrigeration board supply could be a useful point. To observe an individual generator, the relevant measurement is on the generator's branch. The name shown in the report should allow the team to find the intended branch, and the category should reflect the purpose and direction of the measurement.

Consider a workshop with a dryer and ventilation plant supplied through one distribution board. A meter at the board incomer combines their loads and provides a board total. A meter on the dryer circuit provides its profile, with no separate reading for ventilation. If both meters are installed, the dryer is already included in the board reading. Use the incomer for the workshop total and carry the dryer through as a breakdown of that total.

When the design includes several devices, confirm exact inverter and meter models, software versions, the communications arrangement and other connected components. A purchase proposal should identify the verified configuration. The comparison of TS 65A-3 and TS 5kA-3 helps frame questions about direct measurement and current transformers. The required measurement boundary is a separate design decision.

A workshop example

Consider a hypothetical business with one grid connection, one PV system without batteries and two branches downstream of a common busbar. Branch A supplies the main workshop. Branch B supplies the office and warehouse. A refrigeration distribution board is part of branch A. The management team wants two reports. The first covers grid exchange for the site. The second shows refrigeration energy while the workshop is operating. This example illustrates measurement coverage. It gives no installed-cost, equipment accuracy or savings estimates.

Illustrative measurement boundaries for reporting at one business site
PointCoverageReporting role
Grid incomerExchange between the whole busbar and the external gridCheck site imports and exports
Branch A incomerMain workshop, including the refrigeration boardWorkshop total over the selected period
Refrigeration board incomerCircuits supplied through this boardRefrigeration profile within branch A
Branch B incomerOffice and warehouseSeparate total for this branch

The grid boundary is a candidate for the primary point when the job is reporting grid exchange. The refrigeration board is a candidate for the secondary point when the job is profiling that load. If an alternative drawing places the primary meter inside branch A only, its direct reading excludes the office and warehouse. The project designer should explain where the whole-site report will obtain missing inputs and which outputs will be calculated.

Suppose that across one illustrative operating interval branch A uses 60 kWh, including 22 kWh for refrigeration, and branch B uses 18 kWh. For these two non-overlapping branches the total is 78 kWh. The separate 22 kWh line shows part of the workshop total. Adding it to the branch totals would incorrectly give 100 kWh. To determine grid import, use directional measurements at the relevant boundary, since PV production may supply part of the load.

What to do with shared loads

Identify where shared loads are supplied. A compressor could serve both workshops while drawing power from branch A alone. The branch reading would include the compressor. If the finance team allocates costs to both workshops, document the agreed method and label the allocated shares as calculated. A share derived from operating hours needs inputs for the same reporting period.

If a refurbishment moves the compressor to a common section, branch A energy may fall with no change in workshop output. Record the change time, the new measurement boundary and who confirmed it. Ask the contractor for the first complete interval under the new arrangement and a sample export on each side of the change if both are available. Check that the power chart uses kilowatts and the period total uses kilowatt-hours.

When the design dictates the position

The instructions for the Fronius Symo GEN24 6-10 kW Plus and Symo GEN24 6-12 kW Plus SC call for installation and configuration of the primary Fronius Smart Meter at the grid boundary for the operation described with additional generators and Full Backup mode. They also state that one primary meter can be configured in the applicable system. Verify the documentation for your particular arrangement before using the consumption-branch option in a design that needs these functions.

For a project with several sources, list every source and the circuit through which it connects to the grid. Request one drawing showing meter positions, shared busbar sections and the limits of any backup supply. This reveals whether reporting depends on the same measurement point the control system uses. If the report is for checking an invoice, identify the official billing data source for your site and agree how the comparison is to be made.

Moving a meter during an upgrade changes the time series boundary. If a device covered branch A in April and was moved to the site incomer in May, a comparison of figures labelled “Consumption” will not establish which load grew. Record the time of change and retain both revisions of the drawing. For a review of adjacent readings, see why solar inverter and meter readings differ.

What to ask for at handover

Before the business takes ownership of reporting, request a measurement schedule. Each row should contain the role, the name in the monitoring platform, the point on the single-line diagram, the loads or sources covered, the directions of flow, the available units and the date the series begins. For a secondary meter, include which higher-level total contains its branch. The schedule helps the business maintain useful reports when staff, board names or connected loads change.

Ask the responsible specialist to confirm directions during agreed verification intervals and record the configuration versions. The owner can check the completeness of the record and the clarity of the names without opening a board or changing any parameters. Agree ahead of time what will serve as the reference when monitoring data is delayed. If you also need evidence that feed-in is limited, define the solar export control requirement separately and agree how it will be verified.

Finally, agree which two or three values the operating team will open each week. For the example site, these might be grid exchange, workshop use and refrigeration use as a line under the workshop total. Retain the boundary, unit and period in each column heading. The business then has a report that answers separate questions about grid exchange, workshop energy and one particular load.

If the list of measurement points is still open, share the schedule and single-line diagram with the solar design team.