Choose between PVGIS typical-year weather and an hourly historical series, then align the data with a business load profile.

ReadAll Articles
A model solar panel, clock, calculator and blank papers on a white background

Table of Contents

A PVGIS typical meteorological year is useful for a representative-weather scenario. An hourly historical series helps test a calculation against particular past years. Before joining either to a business load profile, establish whether the file contains weather or modeled solar power, which years and timestamps it uses, and how those timestamps relate to the meter's intervals.

This guide describes PVGIS 5.3 formats. Output calculated using historical weather is a model, not measured production from a roof. A typical year combines selected months from different years, so pairing it with a business schedule creates a scenario as well.

Choose the question before the export

If you need weather input for a baseline simulation, start with a typical meteorological year, or TMY. PVGIS supplies hourly meteorological data for a location. It selects a typical month for each calendar month from the available historical period, using solar irradiation, air temperature and relative humidity. January and February can therefore come from different years.

If the question concerns particular dates and weather conditions in past years, use the hourly historical series for the relevant location and period. The tool can also calculate PV power for an assumed system when requested. This permits a comparison with load on the same dates, provided the business records are available and suitable for that comparison.

The choices can complement one another. TMY can serve as a baseline scenario, while individual historical years help show sensitivity to weather selection. Save the results separately and label the purpose of each one. For the broader decision about capacity, see the guide to a business load profile for solar sizing.

Choose the data for the question
QuestionDataLimit
Baseline weather scenarioTMY and a PV modelMonths come from different years and TMY itself is not generation
Comparison for particular datesHistorical hourly series with PV calculationWeather and power are modeled and require compatible load data
Future working calendarTMY or historical weather and a separate load scenarioDocument weekends, holidays and how dates are mapped

Keep the origin of every file

On the calculation record, enter the PVGIS version, coordinates, solar radiation database, first and last year, file format and export date. The available period depends on the database, location and release. Do not copy years from a documentation example into your own record without checking the actual export header and settings.

For a TMY CSV, retain the list showing the selected year for each month. It identifies the source of the weather but does not turn the assembled data into one continuous calendar year. Record the subsequent PV model that converts weather to system power and its assumptions. The month list alone cannot reproduce the electrical result.

For a historical calculation, save the system settings with the file: module capacity and technology, plane, horizon and assumed losses. Compare weather years using the same PV assumptions when the purpose is to examine weather sensitivity. If the configuration changes, that is a different scenario. Avoid putting files from different releases under one label.

Documentation for an individual release may retain examples of older periods. Another release or database can offer a different range and use different rules. The acceptance record should therefore identify the actual file and metadata, not just the PVGIS name. Keep the original export alongside any converted copy so a later reviewer can trace each transformation.

Distinguish weather, power and energy

TMY contains, among other things, horizontal irradiance, temperature, humidity and wind. Irradiance in W/m² is not plant power in W and is not consumption in kWh. A system model with documented inputs is needed to produce a series for a particular plant. Do not compare a weather column directly to a meter reading.

The PVGIS 5.3 hourly data tool can calculate PV output when that option is requested. Its P field gives calculated power in watts. For an educational hourly balance, one can approximate interval energy as P in kW multiplied by one hour, producing kWh. Record this assumption before using it and check the chosen database's time semantics. It does not make an instantaneous satellite estimate an exact hourly average.

An hourly comparison cannot show variations within the hour. Even when hourly totals agree, short peaks in demand and generation may occur at different moments. A decision sensitive to shorter intervals needs appropriate data and a separate method. The modeled value is not a meter reading and does not establish future production.

Align timestamps and interval boundaries

PVGIS 5 TMY CSV and JSON use UTC timestamps labeled HH:00. The irradiance values correspond to the actual SARAH data time or HH:30 for ERA5. The header includes an Irradiance Time Offset. It is used, for example, to determine solar height when converting irradiance to a plane. Do not automatically shift the whole load series by that amount without checking the meaning of each field and the import method.

EPW has a different convention: its time is local, and a value represents the hour preceding the indicated label. For the historical hourly export, check the timestamp of the selected database. PVGIS documentation describes SARAH satellite irradiance as an estimate at the indicated instant, used as an approximation for the hour. ERA5 irradiance is an hourly average labeled at HH:30, the middle of the hour. Other meteorological variables also have their own documented basis.

For the business records, establish the time zone, daylight saving changes and whether the meter label marks the start or end of an interval. Convert both sources to one time basis while preserving the originals. Check the repeated or missing local hour during clock changes, as well as the additional day in a leap year. An unknown time zone is an open question, not an invitation to guess a shift.

Match boundaries rather than identical labels alone. For example, a meter entry labeled 11:00 may cover consumption from 10:00 to 11:00. If the modeled series uses start-of-hour labels, the matching interval is labeled 10:00. Agree the rule before joining and check several rows by hand. The guide to solar monitoring timestamps covers alignment of operating data sources.

A spreadsheet join can look complete while pairing different hours. Inspect the first and last interval of a day and the transition between dates. If a source uses a fixed offset while the site meter follows local clock changes, document how both map to UTC for each affected date. Keep unresolved records out of the calculated comparison until their interval can be established.

A small hourly matching example

Consider a fictional three-hour extract from one day. It is neither a PVGIS download nor a real site. Both datasets have already been converted to UTC. For illustration, assume calculated power is constant throughout each hour and load was measured over that same interval. The energy balance uses one common boundary, with no storage or export. Plant constraints and additional losses beyond that boundary are excluded.

Hypothetical balance over three hours
UTC intervalPV, kWLoad, kWhCoincident use, kWh
08:00-09:00203020
09:00-10:00504040
10:00-11:00302525

Estimated modeled generation is 20 + 50 + 30 = 100 kWh. Load is 30 + 40 + 25 = 95 kWh. Without storage, coincident use in each row is the smaller of generation and load: 20 + 40 + 25 = 85 kWh. That leaves 15 kWh of potential surplus before generation is curtailed and 10 kWh of demand for another source.

Comparing only the totals of 100 and 95 would not reveal those two flows. Surplus in the second and third hours cannot offset the earlier deficit in the first. A storage model needs an initial state of charge and chronological calculation of the intervals. A calculation using an actual file must define constraints, the balance point and operating controls separately. This example does not establish profit, an optimum PV size or battery operation.

It also assumes that the two quantities coincide within each whole hour. Real intrahour variation can reduce coincidence even when both hourly totals are known. Treat the 85 kWh as the result of the stated simplified method, not a meter-verified quantity. The example demonstrates the arithmetic used to screen the data, not a prediction for a facility.

Check the scenario before using it

For historical years, use load from the same dates where possible. This preserves the actual business calendar and any relationship it may have with weather. If the operation changed in a particular year, record why and do not call it typical automatically. For TMY, specify separately how working days, holidays and a leap day are assigned. The weekdays of the selected weather months may differ from the future calendar.

Check missing and duplicate records, units, interval counts and the data boundary. An absent reading is not zero. Do not hide incomplete coverage inside an annual total. Retain source files, time conversion rules, calendar scenario and calculation sheet so another person can reproduce the result.

Before accepting the comparison, inspect representative rows at the start of the year, around a daylight saving transition and at the end of the period. Confirm which rows were excluded and whether both sides of the comparison cover the same interval. A calculated total without this record can conceal a mismatch that changes the apparent coincidence.

Give the solar design team the export and its metadata, a sample meter file, interval definitions and open timing questions. Ask them to document the chosen years, PV model and matching rules with the inputs. This provides a basis for the site-specific calculation while keeping uncertain assumptions visible.

Questions about PVGIS data

Ready for energy independence?

Get a free consultation and individual calculation for your business.