Solar panels and a heat pump for a business
Solar power systems

Solar panels and a heat pump for a business

How to compare seasonal heat pump electricity use, other loads and solar generation.

ReadAll Articles
Solar panels and a separate outdoor heat pump unit on a white background

Table of Contents

Solar panels can supply part of a business heat pump's electricity when generation and equipment operation coincide. Annual PV output or the heat pump's rated thermal capacity alone cannot determine that share. An assessment needs interval data, seasonal building operation and the permissible limits of thermal control.

First prepare separate electricity profiles for the heat pump and other site loads, then compare them with forecast or measured solar generation. The illustrative example below explains the balance; it is not a prediction for a particular building. Heating and electrical designs require review by qualified specialists in the relevant fields.

Keep heat and electricity separate

Thermal capacity in kW describes heat delivery under specified conditions. Electrical power in kW describes the load on the electrical system. One number cannot be substituted for the other. Energy over time is measured in kWh; it too must be identified as heat or electricity and associated with a measurement boundary.

Do not apply one nameplate efficiency figure to every hour of the year. Operating conditions vary, and electrical use may include circulation pumps, controls and an additional heat source. Determine which components are included from the site diagram and the actual equipment documentation. A building's annual electricity bill cannot automatically separate them from all other consumers.

A heat pump may serve space heating, hot water or, if the system supports it, cooling. Each mode has its own schedule and demand. Record what the business actually needs and do not assume a function exists merely from the equipment name.

Read COP with its conditions

The coefficient of performance, COP, compares heat delivered with electricity consumed at a defined boundary and under stated conditions. A comparison needs the source temperature, heat delivery temperature, operating mode and included electrical loads. A value at one test point is not the average for a whole season. Establish whether the electrical boundary includes circulation pumps, controls and any supplementary heater.

For a teaching example, assume the same demand of 24 kWh of heat in two different periods. With a fictional COP of 3 at the same boundary, electrical consumption is 24 / 3 = 8 kWh. At a fictional COP of 2, it is 24 / 2 = 12 kWh. All values are invented, not a specification for a model or a forecast for a business.

The arithmetic shows an energy relationship only. It does not prove that the heat pump can deliver the required output in cold conditions or that a supplementary heater and auxiliaries are already included. Determine annual electricity use from actual or design operating conditions, their duration and an agreed boundary, rather than multiplying this illustration by a number of days.

Collect the inputs before calculating

Where possible use a year of measurements, or explain the limits of a shorter available period. For a new heat pump, request a project hourly profile or another justified profile and keep assumptions distinct from measured data. All series must use matching time intervals and consistent electrical boundaries.

Data for comparing PV and heat pump operation
DataRecordPurpose
Thermal requirementsWorking hours, heat and hot-water demand, permissible temperaturesIdentify what can change without disrupting operation
Heat pump electricityInterval readings, included components and meter boundaryCompare actual load with solar generation
Other loadsProfile of the remaining site, operating hours and shutdownsAvoid allocating the same energy twice
PV plantGeneration or forecast at a defined boundary, limits and gapsBuild a consistent interval balance

Record the time zone, interval length and origin of each series. If PV is already installed, grid purchases may not reflect total consumption. The general process for preparing site data is covered in commercial solar sizing using a load profile.

For hot water, add draw-off times, tank volume and agreed temperature limits. For a process circuit, provide its time profile, supply temperature and permitted interruptions by operating mode.

Compare seasons and then hours

Heating demand and solar output can change differently over the year. For a heated site, examine cold periods when heat demand can be substantial and generation limited. The shoulder seasons and summer hot-water or cooling operation have their own profiles. Do not promise the same coverage percentage for every month.

A monthly table helps identify differences, but equal monthly totals do not guarantee coincidence. A heat pump may operate in the morning while the strongest PV output falls in other hours. To assess direct use, compare matching intervals and account for the building's other consumers.

Start with several representative days, then check the full available period. Mark temperature-setting changes, weekends, holidays, process shutdowns and missing readings. Do not call assumed or modelled values measured values. Retain forecast assumptions so they can be compared with operation after commissioning.

An illustrative two-hour balance

Use these teaching values for potentially available PV energy at the alternating-current boundary before any curtailment and for demand at the same boundary. Each interval lasts one hour. Assume constant power, an available grid and no battery, other generators or additional losses at this boundary. For the allocation, other site loads are given priority. The example is not the performance of any heat pump model or a particular day's weather.

Illustrative generation and demand over two hours
HourAvailable PV before curtailmentOther loadsHeat pumpDirectly to heat pump
10:00-11:0030 kWh20 kWh8 kWh8 kWh
11:00-12:0020 kWh16 kWh8 kWh4 kWh

In the first hour, 30 - 20 = 10 kWh remains after other loads, so the pump can use all 8 kWh it needs. In the second hour, 20 - 16 = 4 kWh remains; another available source must supply the other 4 kWh. Across the two hours, direct solar contribution to the heat pump is 12 kWh out of its 16 kWh electricity consumption.

The ratio 12 / 16 = 75% applies only to these two assumed hours. It is not a seasonal or annual figure. In the first hour, 2 kWh of potential surplus remains after all loads. It is not automatically generated or exported. If export is prohibited and the surplus is curtailed, actual generation is 28 kWh in the first hour and 48 kWh across both hours. If export is permitted, actual generation could be 50 kWh in total, including 2 kWh exported. The actual mode requires a separate check. Load priorities, changes within the hour and measurement boundaries can alter the outcome.

The priority in the table is an accounting assumption that makes the allocation reproducible. Electricity is not physically labelled for an individual heat pump, and another allocation convention could assign it a different share of the same generation. The total site balance matters alongside the assigned share.

Can operation move into solar hours?

Some systems have permissible thermal storage in the building or a buffer tank. This may allow part of the heat pump's operation to shift without leaving agreed temperature limits. It does not mean every heating task can be postponed. Processes, hot water and occupant conditions need separate requirements from the owner and designer.

Compare baseline and controlled operation using consistent inputs: temperature and usable thermal reserve, equipment limits, operating hours, generation forecast and other loads. Record whether the required temperature was achieved before the shift and what happened after the solar window. Include cold or cloudy conditions instead of checking only a favourable example.

If an electrical battery is added, assess its power, available energy, losses and integration separately. A thermal reserve and a battery store different forms of energy and serve different tasks. Operating modes are discussed in solar PV with energy storage. Neither option alone guarantees operation during an outage.

Create a control scenario that can be tested

Start with a baseline in which the heat pump meets thermal demand without a special PV signal. Keep its schedule, setpoints and measured intervals as a fair comparison. Then determine permissible temperature limits with the heating specialist and specify events that must stop the controlled mode. Additional heating must remain within equipment limits and the actual process requirements.

For the alternative scenario, specify the trigger: a forecast, measured surplus or a timetable. Identify the measurement point and how the controller distinguishes surplus from power needed by other loads. Ask what happens when a reading is wrong, communications are lost or site demand changes. These conditions belong in the project tests rather than an undocumented operator decision after installation.

Compare more than energy coinciding with solar production. Check total system electricity, temperature compliance and the number of operator interventions. A changed schedule may change how equipment operates, so assess the complete agreed system under comparable conditions. Do not extend a single day's result to a season without a full calculation.

What to request from the designer

Ask for an input table with units and measurement boundaries, seasonal profiles and an interval-by-interval calculation. It should separately show PV generation, other loads, heat pump operation, grid import and any potential surplus. Identify whether each series came from a meter, model or assumption. This makes the calculation reproducible when a tariff, timetable or equipment selection changes.

Record the question each scenario answers: coincidence with solar output, delivery of required heat or operation during an outage. The last requires a separate backup design assessment, including starting conditions and available power. When an input is missing, record the uncertainty and identify the measurement that could reduce it.

Agree responsibilities before procurement and after launch

Identify who owns the heating design, electrical design and control integration. Specify permitted temperatures, hot-water or process priorities, the additional heat source's role and the response to lost communications. Ask which meters and signals are available and what will be tested during acceptance.

After commissioning, compare forecast and measured profiles without mixing measured and modelled values. Differences may reflect weather, building schedules, controls or meter boundaries. Use the ONG Solar services page to provide your load profile, available heat pump data, site diagram and thermal requirements. These inputs support a discussion of next steps for the actual site.

Solar and heat pump questions