Solar cable: how to review cross section, length and losses
Design, installation and service

Solar cable: how to review cross section, length and losses

Review a PV cable schedule, define the two-conductor loop and reproduce a voltage drop estimate before procurement.

ReadAll Articles
Coiled solar cable with connectors and exposed conductor beside a solar panel on a white background

Table of Contents

Solar cable should be reviewed against a defined circuit, route and operating conditions. A budget line saying “6 mm² solar cable” leaves essential questions unanswered. You need the exact product, conductor lengths, electrical inputs, installation arrangement and a documented calculation. For a business owner, the useful outcome is knowing what has been approved for procurement and which changes require another review.

This guide explains how to read a cable specification and follow a DC loss estimate between identified points in a solar installation. Its numerical example is hypothetical. Selecting the conductor size and verifying current capacity, protection and installation remain part of the project design.

Define the circuit and the calculation boundary

A solar installation contains several cable sections: module connections, string home runs, combined DC feeders and the inverter AC output. Storage introduces a separate battery circuit. These sections have different currents, voltages, terminations and operating conditions. Matching power ratings in kilowatts do not make their cables interchangeable.

Each cable schedule entry needs a start and end point. “From the string end connectors to the inverter input” gives the reviewer a clear boundary. “Cable to the roof” leaves uncertainty about module leads, transitions, additional connections and indoor sections. A percentage loss without a defined boundary cannot be checked consistently.

Match the line identifier to the route plan and electrical diagram. If the string arrangement is still changing, first review solar panel and inverter compatibility. The cable estimate uses agreed current and voltage inputs; it does not replace the inverter input checks.

Read the schedule as a set of checkable inputs

Ask for the complete cable designation, manufacturer, item code and datasheet revision. Cross section describes conductor area; outside diameter is a separate property. Both matter when reviewing connectors and entries. A general cable type designation does not establish every characteristic of the supplied version.

What one cable schedule entry should make clear
Input groupWhat to recordWhat it helps verify
IdentityCircuit, endpoints, model, item code and datasheetWhether procurement matches the calculation
GeometryCross section, outside diameter and both conductor lengthsLine resistance and suitable terminations
Electrical conditionsOperating current and voltage, separate limiting casesThe correct basis for each assessment
EnvironmentTemperature, installation arrangement, grouping and exposuresWhether the datasheet conditions apply
DecisionLoss estimate, acceptance criterion, revision and reviewerApproval evidence and control of changes

Separate calculated installed length from the quantity purchased. Unused cable on a drum does not increase installed line resistance. Actual rises, diversions and planned installation allowances belong in the calculated length. Keep units visible: metres, square millimetres and ohms per kilometre require appropriate conversion before calculation.

Assign missing evidence to an owner. Each alternative product needs an explicit review before delivery; listing alternatives does not establish equivalence. An agreed decision connects the drawing, calculation, order and supplied components, giving the owner a clear basis for checking delivery.

Separate electrical ratings from thermal conditions

Permitted DC voltage, continuous current, conductor temperature and environmental suitability answer different questions. A small voltage drop does not demonstrate acceptable heating. A high voltage rating does not establish suitability for every installation arrangement either.

A datasheet may list different current capacities for different conditions. Read the notes covering a single cable in free air or on a surface, ambient temperature and neighbouring circuits. A value for one freely exposed cable cannot simply be transferred to a group inside an enclosed channel. Ask the designer to identify the method and corrections used for your route.

Distinguish air temperature, cable outer temperature and conductor temperature. A maximum conductor temperature does not promise the same permitted ambient temperature. Fault conditions and protection coordination also require separate assessment. Calculating normal operating losses does not complete those checks.

Suitability for sunlight, moisture, mechanical exposure or an underground route belongs to the exact product and stated conditions. The letters “PV” alone do not establish approval for a particular route. Record questions about unusual sections and obtain the required confirmation before ordering materials.

Check loop length and the resistance basis

Both conductors contribute resistance in a two-wire DC circuit. If each conductor is 35 m long, the loop length for this calculation is 70 m. If the routes differ, add their actual lengths. Doubling a distance is appropriate only when the lengths are equal and have not already been added.

Use the selected cable’s documented resistance and record its reference temperature. One specific single-core PV cable datasheet lists 3.39 ohms per kilometre at a conductor temperature of 20 °C for a 6 mm² tinned copper conductor. This value is used only for the illustrative calculation: it does not describe every cable of that size or establish availability of this product in Ukraine. Check the datasheet for the actual supplied cable; conductor sizing requires a separate assessment.

Another conductor temperature requires a corresponding resistance value or a justified conversion method. An air temperature forecast is not the conductor temperature. If the estimate uses resistance at 20 °C, keep that limitation visible in the conclusion. Identify excluded connections and cable sections as well.

Reproduce a hypothetical DC loss estimate

Assume two conductors of 35 m each, resistance of 3.39 ohms per kilometre at a conductor temperature of 20 °C, current of 13 A and source voltage of 600 V at the beginning of this section. These are example conditions. Connector contact resistance, module leads, other circuits and inverter conversion are excluded.

First convert length: 70 m = 0.070 km. Loop resistance R = 3.39 × 0.070 = 0.2373 ohms. Voltage drop ΔU = I × R = 13 × 0.2373 = 3.0849 V. Relative to the stated source voltage, the percentage is 3.0849 / 600 × 100, or approximately 0.514%.

Power dissipated in these two conductors is P = I² × R = 13² × 0.2373, approximately 40.10 W. Input power for the stated point is 600 × 13 = 7800 W. Under this simplified model, approximately 7759.90 W reaches the end of the section. This describes one operating point.

For sensitivity only, suppose resistance increases by 25% while length, current and source voltage remain unchanged. Resistance becomes 0.296625 ohms, voltage drop approximately 3.856 V and power loss approximately 50.13 W. The multiplier of 1.25 is hypothetical; it has not been assigned a particular copper temperature.

The resulting 0.514% does not establish acceptance. The criterion comes from the project brief and applicable requirements. Comparing it with an arbitrary “2% allowance” would leave current capacity, temperature, maximum voltage, protection and terminations unresolved.

Keep one operating point separate from annual yield

Current and temperature change throughout the day. With constant resistance, power loss follows the square of current: halving current reduces this loss to one quarter. Multiplying 40.10 W by every hour of the year therefore does not provide a reliable annual energy loss.

An annual estimate needs time-based current and temperature conditions with consistent model boundaries. Estimate the loss energy for each interval and add the results. Check whether cable losses already appear in the overall generation model. Subtracting the same effect again understates the forecast.

Keep conductor losses, contact losses, inverter conversion and AC distribution separate. A difference between forecast and actual generation does not identify the responsible cable section. The cable schedule supports investigation of a defined part of the system, rather than explaining every yield deviation.

Check terminations and the approved connector pair

Cable-to-connector suitability and compatibility between the two connector halves are separate checks. Identify the exact types, manufacturer, permitted conductor area and outside diameter ranges, together with the relevant instructions. Similar appearance and mechanical fit do not demonstrate an approved pairing.

Ask for the approved pair of the same manufacturer and type to be recorded against its documentation. A general compatibility statement in a quotation is insufficient evidence. Check the installed module and equipment connectors too. A cable substitution may require the terminations to be reviewed even when conductor area stays unchanged.

Agree who checks that components, tools and workmanship meet the applicable instructions. Cable preparation, assembly and inspection belong to a qualified contractor. This guide provides no universal crimp dimensions or sequence for working on electrical connections.

Approve a change as a revised decision

Consider a hypothetical route change: an inaccessible passage adds 12 m to one conductor. Purchased spare cable may cover the extra length, but it does not update the calculation. The route drawing, relevant conductor length, loss estimate and installation conditions need another review.

For a proposed substitute, compare more than conductor area and price. Check resistance, voltage, temperature limits, sheath, diameter, permitted use and terminations. Ask the responsible reviewer to record whether the substitution is approved, awaiting clarification or unacceptable, with reasons and outstanding questions.

Preserve the previous revision and the reason for change. Record the date, reviewer and corresponding project file. Procurement, installation and future service can then use the same actual specification. The guide to business solar project documents explains how this record fits into the wider project package.

Define the cable evidence needed at handover

Before solar installation work, agree the cable deliverables: actual routes, line identifiers, specification, approved changes and the planned inspection records. Appearance alone cannot confirm every hidden parameter. Measurement scope and acceptance criteria belong in the design and handover programme.

  • Every line can be located on the diagram and matched to its records.
  • Actual lengths and installation conditions match the final calculation.
  • Cables and terminations are identified, with no unapproved substitutions.
  • Each outstanding issue has an owner and evidence of closure.

For a solar project design discussion, provide ONG Solar with the route plan, string diagram, equipment datasheets and proposed cable schedule. Agree the required checks and conclusion format before procurement. This makes cable selection a traceable decision for the particular circuit being built.