Solar loan cost: comparing cash flows
Financing

Solar loan cost: comparing cash flows

Compare two complete schedules with equal usable proceeds, account for a fee, and separate total payments, the periodic financing rate and liquidity.

ReadAll Articles
A solar panel on a stand, two blank folders, an hourglass and a calculator on a white background

Table of Contents

Compare two solar loans using the cash the business actually receives, every included payment and its timing. Total excess payments and an annual equivalent financing rate answer different questions. Even with identical net proceeds, a smaller payment total can have a higher calculated funding rate when money is returned earlier.

The schedules and calculations below are entirely fictional. This is an analytical business-financing model, rather than a current lender offer or a statutory calculation of consumer-credit APR. It explains the difference between two payment patterns. A decision still needs the actual terms and the business's ability to meet them.

Define the comparison boundary

Start with the same task: how much cash must be available to pay for the agreed part of the solar project, and when? Two headline loan amounts can differ while leaving the business with identical cash after a fee deduction. Equally, identical contractual amounts do not establish identical funds available for the supplier.

This calculation includes only the stipulated financing receipts and payments. Solar generation, savings, taxes, VAT, insurance, security and other expenditure outside these schedules are not modeled. Review those items separately for actual offers and define the chosen boundary. An unknown cost stays unknown instead of becoming zero. The broader business solar financing terms require their own review.

Retain both offer versions and every payment through final settlement. A file that stops before a large final payment cannot establish the cost of the complete financing arrangement. Knowing only the usual monthly instalment is insufficient for this task too.

Reconcile net proceeds

Fictional option A disburses UAH 600,000 without an upfront fee. Fictional B disburses UAH 625,000 with a UAH 25,000 fee withheld at the same moment. B's available cash is 625,000 − 25,000 = UAH 600,000. Both schedules therefore start with the same usable amount.

Using net proceeds does not remove B's fee from the calculation. It is already included through the smaller initial receipt. Adding the same UAH 25,000 as another outflow would count it twice. Conversely, treating all UAH 625,000 as freely available would omit the deduction.

A fee paid on another date, or financed under a different borrowing arrangement, needs the corresponding actual cash flow. Do not replace that flow mechanically with a deduction at the start. The guide to comparing solar loans and finance leases discusses the complete scope of alternative agreements.

Fix the timing and signs

Assume twelve exactly equal model months. Time 0 is the common start. Every subsequent payment occurs at the end of its corresponding period. Actual calendar dates and differences in month lengths are not used. The result is therefore a rate per model month rather than a calculation based on actual dates.

Use the borrower's viewpoint: receipts are positive and payments negative. Both initial net flows are +UAH 600,000. Only negative payments follow. These fictional schedules stipulate that no payment or residual obligation remains after period 12. That is an input condition, rather than a balance derived from a principal repayment formula.

No contractual interest rates are supplied and payments are not generated from them. A has unequal total instalments, while B has equal ones. Working from given flows does not require both patterns to be annuities. It requires complete amounts in the right order and a consistent time unit.

Read both complete schedules

All table amounts are in thousands of UAH. They are net flows after accounting for the upfront fee. A pays 20 thousand at the end of each of the first eleven periods and 460 thousand at the end of period twelve. B makes twelve payments of 55 thousand. Each row describes a separate time point, not a cumulative amount.

PeriodA, UAH thousandsB, UAH thousands
0+600+600
1−20−55
2−20−55
3−20−55
4−20−55
5−20−55
6−20−55
7−20−55
8−20−55
9−20−55
10−20−55
11−20−55
12−460−55

A's future payments total 11 × 20,000 + 460,000 = UAH 680,000. For B, 12 × 55,000 = UAH 660,000. The excess over initial net proceeds is UAH 80,000 and UAH 60,000 respectively. These are undiscounted monetary totals for the stipulated schedules. They are neither interest rates nor a split of each payment into principal and interest.

Check units before transferring the table to a file. Its initial 600 means UAH 600,000. Converting every flow consistently from thousands of UAH to UAH leaves the rate unchanged: every equation term is multiplied by one thousand. Converting only the initial receipt would create a different, erroneous series. The residual check below uses UAH. NPV's monetary unit must match its inputs, while the rate itself is dimensionless for the defined period.

Solve the cash-flow rate

Find a monthly rate i for which the value of all flows discounted to time 0 is zero. With our sign convention:

0 = CF₀ + CF₁ / (1 + i) + CF₂ / (1 + i)² + ... + CF₁₂ / (1 + i)¹².

CF denotes the flow for its period, including its sign. The initial receipt is not discounted. Each subsequent payment is divided by the factor for its period. A numerical solution of that equation gives periodic IRR. Both patterns here contain one initial positive flow followed only by negatives. Their discounted sum changes monotonically for positive rates, so the positive root found for each is unique.

The result is approximately 1.2611% per model month for A and 1.4977% for B. The calculation retains unrounded values, while these percentages are displayed for reading. Substituting the unrounded solution back into the equation gives an absolute NPV residual below UAH 0.01 for each schedule. Check the entire series, including the initial flow.

Keep the individual payments and the checking formula in the calculation file. A number without its inputs does not reveal an omitted final payment or fee. If substituting a rounded display rate changes the residual slightly, return to full precision for the control result. Do not adjust a payment to force a preferred outcome.

Separate annual equivalent from total

For twelve identical model months, calculate the annual equivalent as (1 + i)¹² − 1. Simply multiplying i by 12 gives a different quantity. This conversion expresses the equivalent of the same periodic factor. It does not change the contract or the actual payment schedule.

Model resultAB
Initial net proceedsUAH 600,000UAH 600,000
All future paymentsUAH 680,000UAH 660,000
Excess over net proceedsUAH 80,000UAH 60,000
Monthly IRR1.2611%1.4977%
Annual equivalent16.2277%19.5288%

B has the lower undiscounted payment total but the higher annual equivalent financing cost. A leaves a substantial part of its payments until the final period. The timing of returned funds explains why ranking by total differs from ranking by rate. Neither measure should be relabeled as the other.

A's lower rate also does not resolve the large final UAH 460,000 payment. Assessing available cash at payment dates needs a separate business cash calendar. The guide to solar loan payments and seasonal savings covers that task. The price of funds and the ability to repay them on time need consideration together.

Preserve the limits of the result

This periodic IRR is not the return on the solar installation. It comes from the financing receipts and repayments. Investment expenditure, generation and avoided electricity purchases belong to a different model, discussed in the guide to checking business solar payback. Subtracting one percentage from the other does not produce a ready-made business profit.

Irregular actual dates need a calculation that accounts for those dates and the agreed time basis. Further drawdowns, fee refunds or other sign changes require a separate check of whether a solution exists and is unique. A failed calculation does not mean the funding cost is zero. Unknown payments and obligations beyond the horizon remain open until the required data is supplied.

Hand over the calculation with the decision

Retain initial net proceeds, the complete calendar, included costs, exclusions, the time unit, unrounded rate and NPV check. Show total payments and the largest individual instalments beside them. Selection may depend on liquidity, contractual restrictions and other confirmed conditions that a single percentage cannot capture.

For solar loan application support, prepare an agreed project estimate and the individual schedules received. Agree the project-related part of the package, while the company's responsible specialists review the financial terms. The teaching calculation should help formulate questions about those offers. It does not replace them or guarantee the best loan.

Questions about solar loan cost