Installation
Professional turnkey solar power plant installation. From equipment delivery to commissioning and online monitoring connection. We work quickly, with quality and with warranty.
SPP installation stages by ONG Solar
- Site preparation - cable duct installation and grounding
- Structure mounting - mounting profile and bracket installation
- Panel installation - solar module placement and fixing
- Cable routing - DC and AC cables with labeling
- Inverter installation - inverter mounting and connection
- Commissioning - parameter setup and full system testing
- Monitoring connection - online yield monitoring configuration
Installation warranty
ONG Solar provides a 2-year warranty on installation work. All installers hold qualification certificates and have completed manufacturer training. Civil liability insurance during work execution.
Installation timeline
Installation of SPPs from 30 to 500 kW takes 3 to 14 business days. Upon completion we provide a full set of as-built documentation.
Service Composition
- Turnkey installation
- Commissioning
- Online monitoring
ONG Solar Advantages
- 01Certified InstallersExperienced and certified specialists
- 02Free DeliveryFree equipment delivery to site
- 03Fast InstallationInstallation in 1–4 weeks
- 04WarrantyWork warranty
How It Works
Simple and transparent process from application to result.
Ready to start?
Leave a request — we will contact you during the working day, clarify details and prepare a proposal.
Other Services
Investigation of the solar power plant (SPP) installation site.
- Area and structure assessment
- Consumption analysis
- Recommended capacity
Solar power plant (SPP) design.
- Schemes and specifications
- Inverter/battery selection
- Technical solution approval
Solar power plant (SPP) maintenance service.
- Monitoring and alerts
- Maintenance 1–2 times/year
- SLA response
CERTIFICATES
Working with Market Leaders
We use equipment from leading global manufacturers and have all necessary certificates